Search Results for 'Trisha Kessler'

1 results found.

The Corrib Drainage Scheme

image preview

The waterways of the city are of great engineering significance. Two major projects resulted in the waterways system which exists today. The first scheme was constructed between 1848 and 1858. Its primary purpose was to improve drainage thus reducing winter water levels and the areas of flooded land and also navigation, without any detrimental effect on the mills or fishery interests. So the Eglinton canal was built, the Claddagh Basin, the dredging of the Corrib, Gaol and Western rivers, tailraces, culverts, the weir and salmon pass and Steamer’s Quay at Woodquay

 

Page generated in 0.0321 seconds.