Search Results for 'Hat Factory'

3 results found.

The Corrib Drainage Scheme

image preview

The waterways of the city are of great engineering significance. Two major projects resulted in the waterways system which exists today. The first scheme was constructed between 1848 and 1858. Its primary purpose was to improve drainage thus reducing winter water levels and the areas of flooded land and also navigation, without any detrimental effect on the mills or fishery interests. So the Eglinton canal was built, the Claddagh Basin, the dredging of the Corrib, Gaol and Western rivers, tailraces, culverts, the weir and salmon pass and Steamer’s Quay at Woodquay

Artsy findings on the street in Castlebar

Castlebar’s first silent movie theatre, an all-female tug-of-war battle by Hat Factory workers in 1958, a street crammed with flying linen flags and an interactive light display in a derelict building are all part of a unique arts project being launched in Castlebar tomorrow (Saturday).

A Galway Textile Printers XV

image preview

A challenge hurling match and a return game played between Galway Woollen Mills, Newtownsmyth, and the Post Office was the seed that led to the inauguration of an inter-factory hurling competition. A meeting was held in the CYMS in February 1954 and the following committee was elected: Jimmy O’Connor, GPO, chairman; Tommy Connellan, CIE, secretary; Tom Mooney, the Hat Factory; Sean Duggan, ESB; Sean O’Connor, Galway Woollen Mills; Jimmy Duggan, O’Gorman’s; Paddy Purcell, Sisk’s; Mick McGrath, AA Stuart’s; and Cronan Treacy, McDonoughs.

 

Page generated in 0.0326 seconds.