Search Results for 'David Kiely'

1 results found.

€56m drainage scheme designed to cope with flood levels

A €56 million project to overhaul Athlone’s drainage system, to commence early next year, has been designed to cope with the November 2009 flooding levels, and will greatly reduce the frequency of flooding and of storm overflow into the river.

 

Page generated in 0.0476 seconds.